Search Results
Search results for "ioi city mall"
623 results found for "ioi city mall"
- Toilet Refurbishment. Fit Out Plaster Ceiling, Tiling - Wall, Tiling - Floor and Flooring - Cement Screeding. Wisma Genting
Toilet Refurbishment, Fit Out Plaster Ceiling, Tiling - Wall & Floor and Cement Screeding, Wisma Genting
- Hoarding & Visual, Kiosk, Little Canton, KLIA, Arrival Hall Main Terminal Building (MTB)
Hoarding & visual (kiosk) installation at Arrival Hall, KLIA Main Terminal Building for Little Canton
- Hoarding & Visual c/w Top & Side Fabric Cover (Kiosk), Vinstella Jewellery, Central Icity
Hoarding and visual (kiosk) c/w top & side fabric cover installation at Central Icity for Vinstella Jewellery #hoarding #visual #vinstella #jewellery #kiosk #centralicity #icity
- Floor Protection Requirement, KLCC
Floor protection installation during mobilization of material and equipment at Suria KLCC under mall #floorprotection #mallrequirement #suriaklcc #klcc #rules #compliance
- Floor Protection Requirement during Job On-site
How to inform foreign workers to comply on mall and building floor protection requirement without telling #floorprotection #guideline #mallrequirement #buildingrequirement #drawnbycalvin
- Hoarding & Visual Installation, Defect Occurrence & Rectification Process
Example: A lot within a mall which need to renovate OR empty hence by installing a hoarding will provide For those tenant that moving out from the mall, visual normally not required to install by the tenant that leaving because it doesn't serve the purpose to inform public OR mall patron that you are leaving the mall. looking to announce to public OR mall patron that your brand is coming up within the mall.
- STEPS for Customized Hoarding Arrangement, Confirmation & Installation:
HG plan and send METHOD & CONCEPT of installation to CLIENT, MALL or BUILDING MANAGEMENT for approval CLIENT, MALL or BUILDING MANAGEMENT management approve the METHOD & CONCEPT HG start preparing hoarding details, documents & permit application for submission to CLIENT, MALL or BUILDING MANAGEMENT for final checking and approval HG getting green light from CLIENT, MALL or BUILDING MANAGEMENT to install HG (PE) for record keeping Inspection onsite by CLIENT, MALL or BUILDING MANAGEMENT and/or Professional
- Pillar Banner & Visual, Bingxue, KSL
Pillar banner and visual installation at KSL Esplanade Mall for Bingxue. 21 November 2025.
- Various Hoarding (All White), Sunway Square
Various lot hoarding (all white) installation at Sunway Square (new mall project). 23 May 2025.
- What is Reinstatement? Why need Reinstatement & Restoration services?
Retail lots within shopping malls ( Mall reinstatement ) Commercial shop lots & buildings (factory, school job preparation Make sure obtain WORK PERMIT APPROVAL before start work PEST CONTROL SERVICES by MALL ordered which park at loading bay REPEAT step 7, 8 and 9 until the reinstatement work complete BY MALL partition, bulkhead etc make good, replacement and new installation (if required) NOTES: Different mall For more accurate preparation, please check with mall fit out and/or building management team.
- Hoarding & Visual, F.O.S, Gamuda Quayside
Hoarding and visual installation at Gamuda Quayside Mall for F.O.S. 9 March 2025.
- Hoarding and Visual Installation at Mid Valley Megamall for Lazo Diamond
We had to complete the work without disrupting mall operations. Our team coordinated closely with mall management. This collaboration ensured a smooth process.









