Mall lots & kiosks, shop lots, offices and factories — full or partial reinstatement.
Mall safety briefing & induction, permit application & submission, hot work permit (if required), mobilization, daily floor & site protection, site coordination, site cleaning and daily report submission.
Built-in cabinets/fixtures, wall paneling, partition walls, plaster ceiling & structure, electrical wiring & DB, roller shutter, plumbing, flooring (vinyl/carpet/laminate), AC & exhaust ducting, signage, glass facade/door and metal support structures.
Floor cement screed to concrete slab, floor & wall tiles, brick walls and raised floor platforms. Strong room walls and inter-tenancy (IT) brick walls carry additional charges.
Public liability (RM1mil-5mil per mall requirement), workmen compensation, contractor's all risk, and property coverage add-on if required.
Yes — plaster/skim & painting (walls, pelmet, ceiling slab black-to-white, sprinkler piping red), floor polishing, and door repairs (lockset, painting, make good).
Yes — sprinkler dismantling, wet chemical & FM-200 system dismantling, pest control, FAS/PA speaker & telephone line checking, kitchen/AC exhaust duct cleaning, LPG gas piping dismantling and flushing services.