Reinstatement & Restoration Services

Reinstatement by HG & H.O.R.R (Home & Office Reinstatement & Restoration) is the demolition & reinstatement division under HG Group which provides reinstatement and restoration services for retail lot, office lot, residences & commercial shop to clients within Kuala Lumpur, Selangor and Malaysia nationwide EXCEPT Sabah & Sarawak. 

We are working together with
Summary of Service
Reinstatement Services

What kind of premise(s) do reinstatement
& restoration services required?

Intro image
icon
Retail lots within shopping malls
icon
Commercial shop lots & buildings (factory, school & hospital etc)
icon
Office lot within office tower
icon
Residences (terrace, condo, semi-D and bungalow etc)

Why Every Mall Renovation Needs Hoarding?

1. Reinstatement is to make a renovated premise back to original form.

2. Restoration services is to make sure all items install according to original layout & design.

Method of Statement (Reinstatement Work)

A.

Pre-Reinstatement Work

  1. Purchase insurance
  2. Attend safety briefing (if required)
  3. Submit work permit application with required safety documents
  4. Site walk through with client before start work for job preparation
  5. Make sure obtain work permit approval before start work
  6. Pest control services by mall panel contractor (3rd party) before start reinstatement work (if required)
B.

Reinstatement Work Start On-Site

  1. Before entering working site, change working pass from security office
  2. Install floor & site protection at common walkway area
  3. Workers with PPE gear (safety vest, safety helmet, safety shoes and gloves subject to site requirement)
  4. Mobilizing material, equipment and tools to enter working site 
  5. Start packing items that to keep based on client request
  6. Moving out items that required by client
  7. Start dismantle and demolish unwanted items within the lot
  8. Hacking of flooring until concrete slab
  9. Concurrently, workers to pack debris into gunny bag and move out the bags from lot to throw into the roro-bin provided/ordered which park at loading bay
  10. Repeat step 7, 8 and 9 until the reinstatement work complete

​By mall panel contractor or 3rd party contractors

  1. Sprinkler dismantling work
  2. Wet chemical system dismantling work (if F&B lot)
  3. LPG Gas piping dismantling work (if F&B lot)
  4. Telephone line checking work (if required)
  5. PA Speaker checking work (if required)
  6. Flushing services (if required)​
  7. AC / FCU / AC Ducting services (if required)
C.

Touch Up Work After Reinstatement Work

  1. Wall plastering and painting work 
  2. Existing original sprinkler level 1 piping to paint in red
  3. Existing original AC and exhaust ducting to patch back damage area with aluminium foil sticker
  4. Cover AC ducting hole with GI plate & aluminium foil sticker (if required)
  5. Floor tiles replacement work (if required)
  6. Floor polishing work (FOR KIOSK) (if required)
  7. Pelmet, partition, bulkhead etc make good, replacement and new installation (if required)

NOTES: Different mall or building management is having different requirement. For more accurate preparation, please check with mall fit out and/or building management team.

Types of Restoration Work

icon
Flooring
  1. Install back original cement screed smooth finishing flooring AFTER floor tiles hacking job (Example for shop lot and office lot within office tower)
  2. Install and/or replace existing DAMAGE or NON-ORIGINAL floor tiles back to ORIGINAL FLOOR TILES DESIGN
IMPORTANT NOTES
  • Existing vinyl floor finishes, AFTER removal will be having sticky glue stain whereby will be UNABLE to remove 100% by scrapping off. Estimate 50% to 60% stickiness will be remain onsite depends on what type of glue the previous contractor using during installation.
  • Best solutions is to hack off the existing cement screed surface around 50mm thickness and to re-do the cement screed BUT this solutions is costly. This quotation DOES NOT include to hack and re-do new cement screed flooring.
icon
M&E (Mechanical & Electrical)
  1. Install back electrical power point and/or lighting work
  2. Install back sprinkler point etc
  3. Install back AC, ducting and/or M&E point based on original layout plan
  4. Relocate back main DB to original location
  5. Install new to replace existing damaged isolator (Follow building requirement)
  6. Lot re-wiring work (If required)
icon
Ceiling
  1. Install back original ceiling based on original layout
  2. Install and/or replace existing damaged (2'x2' or 2'x4') ceiling board (Example for office lot within office tower)
icon
Brick Wall or Partition Wall
  1. Install back new brick wall etc
  2. Install back new partition wall etc
  3. Install back pelmet or bulkhead on shop front etc
  4. Install back neutral pier etc
icon
Painting
  1. To supply material and paint to paint back original lot color etc
icon
Others
  1. Metal work
  2. Plumbing & piping work
  3. Glass work
  4. Aluminium work
  5. Building structure restoration work (Example, slab seal off etc)
  6. Others restoration work based on building/mall's management requirement (If required)

Notes: Different mall or building management is having different requirement. For more accurate preparation, please check with mall fit out and/or building management team.

How to Engage HG for Reinstatement and/or Restoration Services

Preferred channel: WhatsApp +60 16-273 3524

icon

The 7-Step Process

  1. Enquiry - You send us your project details via WhatsApp, email, or our website form.
  2. Site Visit / Measurement (if needed) - We visit the site to measure and assess requirements.
  3. Quotation & Invoice - We send you a detailed quote within 24 hours.
  4. Confirmation - You confirm and we schedule the job.
  5. Permit Application (if needed) - We handle mall permits on your behalf.
  6. On-Site Installation - Our certified team installs per mall specifications.
  7. Completion Report - You receive a PDF completion report within 48 hours.
icon

What We Need From You

Please have these ready when you enquire:

  • Lot number
  • Mall / building name
  • Lot size, drawing & details (if available)
  • Site pictures for reference
  • Job start date
  • Work permit copy
  • Mall contact person name & number (if HG applies permit)
  • Insurance cover note (if required for permit application)