Search Results
628 results found for "sunway putra mall"
- Floor Protection Requirement, KLCC
Floor protection installation during mobilization of material and equipment at Suria KLCC under mall #floorprotection #mallrequirement #suriaklcc #klcc #rules #compliance
- Floor Protection Requirement during Job On-site
How to inform foreign workers to comply on mall and building floor protection requirement without telling #floorprotection #guideline #mallrequirement #buildingrequirement #drawnbycalvin
- Hoarding & Visual Installation, Defect Occurrence & Rectification Process
Example: A lot within a mall which need to renovate OR empty hence by installing a hoarding will provide For those tenant that moving out from the mall, visual normally not required to install by the tenant that leaving because it doesn't serve the purpose to inform public OR mall patron that you are leaving the mall. looking to announce to public OR mall patron that your brand is coming up within the mall.
- STEPS for Customized Hoarding Arrangement, Confirmation & Installation:
HG plan and send METHOD & CONCEPT of installation to CLIENT, MALL or BUILDING MANAGEMENT for approval CLIENT, MALL or BUILDING MANAGEMENT management approve the METHOD & CONCEPT HG start preparing hoarding details, documents & permit application for submission to CLIENT, MALL or BUILDING MANAGEMENT for final checking and approval HG getting green light from CLIENT, MALL or BUILDING MANAGEMENT to install HG (PE) for record keeping Inspection onsite by CLIENT, MALL or BUILDING MANAGEMENT and/or Professional
- What is Reinstatement? Why need Reinstatement & Restoration services?
Retail lots within shopping malls ( Mall reinstatement ) Commercial shop lots & buildings (factory, school job preparation Make sure obtain WORK PERMIT APPROVAL before start work PEST CONTROL SERVICES by MALL ordered which park at loading bay REPEAT step 7, 8 and 9 until the reinstatement work complete BY MALL partition, bulkhead etc make good, replacement and new installation (if required) NOTES: Different mall For more accurate preparation, please check with mall fit out and/or building management team.
- Hoarding & Visual, F.O.S, Gamuda Quayside
Hoarding and visual installation at Gamuda Quayside Mall for F.O.S. 9 March 2025.
- STEPS for Insurance Purchase for Work Permit Submission:
nominated contractors Contract Value: RMXXX,000.00 Location of Risk: G12, G13 & G14 at The Shopping Mall quotation INSURANCE company to prepare INSURANCE COVER NOTE and send to HG HG submit permit application to Mall COVER NOTE with OTHERS necessary documents HG wait for permit approval or comment or feedback from Mall
- Sample Hoarding (Kiosk) (All White) with Counterweight (Before & After)
Sample hoarding (all white) with counterweight within a mall.
- Hoarding (Sample MDF) on Construction Site
Sample MDF board hoarding installation during mall construction site stage #sample #hoarding #mdf
- Hoarding (Kiosk, All White), Atria Shopping Gallery
Hoarding (kiosk, white) installation at Atria Mall. 12 September 2024.
- Hoarding (All White), Main Entrance, Megahrise
Hoarding (white) installation at main entrance, Megahrise Mall. 13 September 2024.
- Sticker & Banner (Branding), Various, Evolt Karting, Aeon Bukit Indah, Johor Bahru
Sticker & hanging banner installation for various location (lift, escalator, boom gate, mall entrance








