HOARDING & VISUAL (Indoor Lot & Kiosk) REQUIREMENTS
|
1. |
Hoarding Material |
White PVC Plywood |
NOTES: GI Plate with Metal Structure Hoarding (Proposed Material If Outdoor Hoarding - Expose to Weather) |
|
2. |
Hoarding Structure |
Timber |
|
|
3. |
Hoarding Door Type |
Sliding Door |
1220mm x 2440mm |
|
4. |
Add-On (Counterweight) |
a. For Kiosk (Free-Stand) |
|
|
5. |
Add-On (Fabric) |
a. Top Fabric Surface Cover (Lot) |
|
|
6. |
Hoarding (Lot) Height - Special Request |
Hoarding Height Below AC Grill |
|
|
7. |
Hoarding (Kiosk) Height |
1800mm (6ft) |
|
|
8. |
Hoarding Visual Material |
Tarpaulin |
|
|
9. |
Skirting |
Aluminium Skirting (1inch) |
Top, Bottom, Left, Right |
NOTES: Click HERE for sample hoarding and/or visual installation at Pavilion Kuala Lumpur for your reference
MALL FIT OUT GUIDELINES
|
1. |
EHS Card |
Valid for 3 months |
|
2. |
Site Dilapidation Picture(s) |
Make sure take pictures of existing site condition before start work to avoid any dispute later. |
|
3. |
Floor Protection On-Site (Canvas, Carpet & Plywood OR FloorGard) |
Compulsory installation of floor protection at common walkway area for trolleys & workers mobilization during on-site work and clear off & clean up on daily basis after daily job done. |
|
4. |
CIDB Green Card |
Worker(s) compulsory to have CIDB Green Card in order to work within the mall. |
|
5. |
a. OSH-Coordinator (OSH-C) |
Each project is compulsory to have either one of the role stated depends on project value to base on-site in order to comply to the safety requirement set by mall management. |
|
|
For on-site worker(s) to access WORK AT HEIGHT, it is compulsory under mall safety requirement to use ALUMINIUM SCAFFOLD with GREEN TAG tagging which inspect by AUTHORIZED & COMPETENT SCAFFOLD INSPECTOR. |
REINSTATEMENT GUIDELINES
|
1. |
Preliminaries |
Site Arrangement & Documents Preparation |
|
2. |
Insurance |
a. RM5mil Public Liability |
|
3. |
Reinstatement |
Dismantle, Demolish, Move Out, Clear Off |
|
4. |
Engage by Contractor(s), To Clear Out from Mall Loading Bay Area before 6am Daily (STRICTLY NO OVERNIGHT) |
|
|
5. |
3rd Party Panel Contractor(s) |
a. Sprinkler |
|
6. |
Touch Up and/or Restoration |
After Site Inspection by Mall Fit Out Team (IF REQUIRED ONLY based on Lot Condition) |