(Atria Shopping Gallery) Fit Out Guidelines - Mall Requirements for Hoarding, Visual & Reinstatement
DISCLAIMER: Please note that these guidelines may change without prior notice; we will do our best to update the information as frequently as possible. The information below is intended for your reference only.
For the most accurate and detailed information, please contact the mall's fit-out team directly.
HOARDING & VISUAL (Indoor Lot & Kiosk) REQUIREMENTS
|
1. |
Hoarding Material |
White PVC Plywood |
NOTES: Marine Plywood (Proposed Material If Outdoor Hoarding - Expose to Weather) |
|
2. |
Hoarding Structure |
Timber |
|
|
3. |
Hoarding Door Type |
Swing Door |
1220mm x 2440mm |
|
4. |
Add-On (Counterweight) |
a. For Kiosk (Free-Stand) |
|
|
5. |
Add-On (Fabric) |
Not Required |
Optional (If Required) |
|
6. |
Hoarding (Kiosk) Height |
1220mm (4ft) |
|
|
6. |
Hoarding Visual Material |
Tarpaulin |
|
|
7. |
Skirting |
Not Required |
|
NOTES: Click HERE for sample hoarding and/or visual installation at Atria for your reference
MALL FIT OUT GUIDELINES
|
1. |
Site Dilapidation Picture(s) |
Make sure take pictures of existing site condition before start work to avoid any dispute later. |
|
2. |
Floor Protection On-Site |
Compulsory installation of floor protection at common walkway area for trolleys & workers mobilization during on-site work and clear off & clean up on daily basis after daily job done. |
|
3. |
CIDB Green Card |
Worker(s) COMPULSORY to have CIDB Green Card in order to work within the mall. |
|
4. |
Aluminium Scaffold (BS SCAFFOLD) |
No requirement on scaffold usage. |
REINSTATEMENT GUIDELINES
|
1. |
Preliminaries |
Site Arrangement & Documents Preparation |
|
2. |
Insurance |
RM1mil Public Liability |
|
3. |
Reinstatement |
a. Dismantle |
|
4. |
a. Engage by Contractor(s) |
|
|
5. |
3rd Party Panel Contractor(s) |
a. Sprinkler |
|
6. |
Touch Up and/or Restoration |
After Site Inspection by Mall Fit Out Team (IF REQUIRED ONLY based on Lot Condition) |
