Office Reinstatement Request for Information (RFI), Q&A and FAQ (Frequently Asked Question)
Job Scope:
Reinstatement (Phase 1)
-
Dismantle plaster ceiling
-
Dismantle ceiling board (or to keep? - Is it original?)
-
Dismantle carpet flooring
-
Dismantle partition wall
-
Dismantle glass panel
-
Remove office furniture / workstation
-
Any brick wall to hack???
-
Any flooring to hack???
RFI for Restoration Work (Phase 2)
-
Plaster ceiling area after dismantle need to install back ceiling board or not???
-
After partition wall & glass panel dismantling, all those ceiling board with screw, stain and damaged, need to replace or not?
-
After all the partition wall and glass panel, because of different room for lighting switch and power point, need to do rewiring work or not?
-
Need to install back those AC grill diffuser or not?
-
Need to install back lighting after new ceiling board installation or not?
-
After carpet removal which having glue stain, expected still having glue stain which not able to remove 100%. Mostly can scrap out 60 to 70% only. If need to remove 100%, then to hack existing cement screed flooring and redo the cement flooring
-
IF HAVE, for those wall and floor area which hack till concrete slab, need to redo back the cement screed flooring or not?