Sample Floor Protection at Common Walkway during Hoarding Installation
- hG Group Enquiry MY
- Jul 21
- 1 min read
Floor protection (FloorGard) installation at common walkway area before trolley push to site/lot
Trolley moving on the floor protection installed
Canvas floor protection install in front or space available nearest to the installation lot/site for material placement or trolley parking
After hoarding lot installation completed, trolley move out back to loading bay and worker(s) to dismantle and remove the floor protection from common walkway area.
Worker(s) to clean up the common walkway flooring IF REQUIRED (Etc. sweep & mop with clean water)








Comments