top of page
Search

Sample Floor Protection at Common Walkway during Hoarding Installation

  1. Floor protection (FloorGard) installation at common walkway area before trolley push to site/lot

  2. Trolley moving on the floor protection installed

  3. Canvas floor protection install in front or space available nearest to the installation lot/site for material placement or trolley parking

  4. After hoarding lot installation completed, trolley move out back to loading bay and worker(s) to dismantle and remove the floor protection from common walkway area.

  5. Worker(s) to clean up the common walkway flooring IF REQUIRED (Etc. sweep & mop with clean water)

ree
ree
ree
ree

 
 
 

Comments


bottom of page